Module integration in ERP: Project Management + Production

Integration of Construction and Manufacturing: Prefab, Steel, and Joinery in the UAE

In many UAE companies, construction projects are closely linked with in-house manufacturing:
  • Prefabrication (prefab)
  • Steel structures
  • Joinery and furniture production
However, construction and manufacturing processes are often not integrated.
Typical problems:
  • Production is not directly linked to projects
  • Materials are accounted for separately and incorrectly allocated
  • Production timelines are not synchronized with construction schedules
  • Lack of unified costing (production + project)
As a result:
  • Delays in deliveries to site occur
  • Costs increase
  • Project timelines are disrupted
  • Overall business efficiency decreases
Without integration between Project Management and Manufacturing, the company cannot synchronize production and construction.

How the Module Integration Works

The Project Management + Manufacturing integration unifies production and construction processes in a single system.
Keep your project on track

Manage every phase efficiently with ERP tools

Request a demo

1. Production Orders for Projects

The system allows:
  • Creating production orders for specific projects
  • Linking production to tasks and phases
  • Accounting for product and BOM components
Production becomes part of the project plan.

2. Material Accounting

Material flows are structured sequentially:
  • Materials are purchased and issued to production
  • Finished goods are produced with cost consideration
  • Products are issued to the project
This ensures:
  • Full traceability of materials
  • Correct cost allocation
  • Transparency of costing
Stay ahead of delays

Request a demo

3. Planning and Schedule Synchronization

The system synchronizes:
  • Production schedules
  • Project task timelines
This helps avoid delays and bottlenecks.

4. Full Cost Accounting

The system calculates total cost including:
  • Materials
  • Production overhead
  • Additional expenses
All costs are:
  • Aggregated
  • Included in project cost
This provides an accurate financial picture.
Keep projects running like clockwork

Schedule tasks in FirstBit

Request a demo

5. Delivery to Site

Finished products are:
  • Shipped to the construction site
  • Tracked in transit
  • Recorded upon receipt
This ensures control over deliveries and timelines.

Business Impact From Implementation

Companies achieve:
  • Synchronization of production and construction projects
  • Reduction of delivery delays
  • Accurate costing (production + project)
  • Improved resource utilization
  • Better schedule control
Ensure timely and profitable project completion with FirstBit

Request a demo

FAQ

Is the solution suitable for prefab and modular construction?

Yes. The system fully supports such scenarios.

Can production be tracked per specific project?

Yes. Production orders are linked to projects and tasks.

How are materials accounted for?

Automatically — from procurement to production and project usage.

Is there integration with the warehouse?

Yes. Full integration with Inventory & Warehouse.

Can labor be accounted for?

Yes. Labor costs of production are included in project costing.

Is there analytics for production and projects?

Yes. Comprehensive performance analytics are available.

author
Editorial
First Bit Team
A dedicated team of content writers delivering high-quality content such as news and case studies to the readers of First Bit Blog.
Related terms

See FirstBit ERP solutions in action

Discover how our system solves the unique challenges of contractors in a personalized demo.

After the demo you will get a quotation for your company.
CEO Connect with CEO